5.17.2010

3P at GE

According to this article posted on Business Wire portal, all major products manufactured by GE at its appliance and lighting facility in Louisville, Kentucky will be developed using Lean techniques. More specifically, the company is embracing a 3P (production, preparation and process) strategy.

It appears that Dirk Bowman, GE Appliances manufacturing leader, has the correct outlook and expectation because he states that "the journey will take several years to fully implement" and realizes that a Lean initiative is not merely a quick fix or a simple program to exploit short-term profits.

3P is a powerful tool that often results in the elimination of multiple process steps and dramatically reduces rework. Have you used 3P in the product development process?

4 comments:

  1. GE's lean efforts aren't exactly something to be proud of. Here's one take by Bill Waddell:

    http://www.evolvingexcellence.com/blog/2010/05/lean-as-the-last-resort.html

    He follows up with a couple more posts.

    ReplyDelete
  2. It will take G.E. more than a few years. Their whole Jack Welch philosophy is engrained at G.E. and it is the anti-Christ of Lean. I worked for his offspring at another company, so my experience is vicarious, but I'd guess they're going to use lean tools, such as the 3P, within their sphere of Welchism. The tools approach never succeeds.

    ReplyDelete
  3. I have read most of them and got a lot from them. To me, you are doing the great work. Carry on this. work at home In the end, I would like to thank you for making such a nice website.

    ReplyDelete